How should I configure piping of the VT307V series in the vacuum line in order to hold the work piece?

Please check the mark on the body and connect the 1(P) port to the vacuum pump or vacuum ejector, 2(A) to the work piece (vacuum pad) and 3(R) to release air (or supply pressurized air).